I’ve got most of the stuff below done, and I’m working on Idaho. By the end of the day I’ll at least have everything connected, making it possible to click through from Neah Bay, WA to Bayard, NE without any gaps, which is pretty cool.
I also ordered a new camera which should be in on Monday, so either Tuesday or Saturday I’m going to:
Clinch:
- I-25 Business (Wheatland)
- US-87 Business (Wheatland)
- WYO 13
- WYO 34
- WYO 160
- WYO 270
- WYO 271
- WYO 272
- WYO 310
- WYO 311
- WYO 312
- WYO 314
- WYO 315
- WYO 316
- WYO 320
- WYO 321
and make progress on:
- I-25 (US-26 to south side of WYO 321 at Chugwater)
- US-18 (US-20/US-85 to US-85)
- US-20 (US-18/US-85 to NE State Line)
- US-26 (I-25 to US-85)
- US-85 (south side of US-26 concurrency to WYO 270)
- US-87 (same as I-25)
So that should be fun and it will be interesting to see how much better the photos come out.